The Palestinian Water Authority announced that the occupation army destroyed the water desalination plant during its recent ground operations in the northern Gaza Strip.
It issued a statement that for the sixth consecutive day, its technical crews have been working on assessing the damage in northern Gaza resulting from the Israeli aggression. Due to the massive destruction of residential areas, infrastructure, and roads, they have encountered significant difficulties in their access to water and sanitation facilities.
The Water Authority explained that its technical crews were able to reach the seawater desalination plant in northern Gaza and conduct an initial technical assessment of the extent of damage sustained. The assessment revealed serious technical malfunctions in the electrical and electromechanical components of all the plants operations stages and units. Moreover, the occupation completely destroyed some of the plants main components, which led to the destruction of five seawater supply wells, the plants intake pipeline, two power generators, a pump and a return water line, as well as the destruction of the external fences and output pumps.
The Water Authority confirmed that this plant is the only one serving northern Gaza and the Wadi Gaza area, providing clean water to the entire northwestern neighbourhoods of Gaza City with a production capacity of 10,000 cubic metres per day. There are no alternatives to cover this amount, and it is difficult to drill water wells due to the high salinity of the groundwater reservoir with seawater in the citys western areas.