.. the significant utility solar PV installed capacity required to meet the target would occupy around 13,412 square miles of land, equivalent to 0.43% of the total land area in the lower 48 states, or roughly 50 times the size of Austin, Texas.
Biden's Solar Energy Plan Has A Major Space Problem
| Source: | https://www.zerohedge.com/energy/bidens-solar-energy-plan-has-major-space-problem |
| Published: | Mar 23, 2021 |
| Author: | Tyler Durden |
| Post Date: | 2021-03-23 11:33:19 by Horse |
| Views: | 131 |
#1: NeoconsNailed To: Horse (#0)
NeoconsNailed posted on 2021-03-23 11:44:44 Reply Private Reply