Controlled Demolition, Inc. (CDI) of Phoenix, Maryland, USA (acting as Explosives Design and Performance Subcontractor to Main Demolition Contractor, Dallas Demolition of Dallas, Texas who was working for RiverCap Ventures of Rocky River, Ohio, the General Demolition Contractor) performs the successful explosives felling of 90, Mitsubishi 1000A Wind Turbines in New Mexico. No effort was made to preserve foundations or other wind farm infrastructure. CDIs crew felled the 90 Units in two (2) mobilizations to the site, permitting the Wind Farm Owner to complete salvage of blades and drive-train elements from some of the wind turbines to provide replacement parts for similar Units they operate at other wind farm locations. The Units were safely felled, exactly per plan, and ahead of schedule.
Poster Comment:
Yeah, that looks sooo green.
#1: Esso To: All (#0)
The Glaring Engineering Mistake That Made Wind Turbines Inefficient | Massive Engineering Mistakes
Esso posted on 2021-06-25 10:00:01 Reply Private Reply
#2: randge To: Esso (#0)
Note illiterate misuse of cap's by a journalist so naive as to believe that the blades and drive trains brought down are anything but garbage.
randge posted on 2021-06-25 10:41:26 Reply Private Reply
#3: Anthem To: randge (#2)
Anthem posted on 2021-06-25 10:52:49 Reply Private Reply
#4: randge To: Anthem (#3)
They are not at that point yet.
randge posted on 2021-06-25 11:02:10 Reply Private Reply